Lihat semua

Sila rujuk versi bahasa Inggeris sebagai versi rasmi kami.Kembali

Eropah
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asia/Pasifik
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, India dan Timur Tengah
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Amerika Selatan / Oceania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Amerika Utara
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
RumahProdukLembaga Pembangunan, Kit, ProgrammersPapan penilaian dan Demonstrasi dan KitTPD4S214EVM
TPD4S214EVM Image
Imej mungkin perwakilan.
Lihat spesifikasi untuk butiran produk.
PILIHAN EXPRESS
Kaedah pembayaran

TPD4S214EVM - Texas Instruments

Pengeluar Nombor Bahagian
TPD4S214EVM
Pengeluar
Texas Instruments
Allelco Nombor Bahagian
98D-TPD4S214EVM
Waranti
Waranti Allelco 1 tahun - Ketahui lebih lanjut
Penerangan Bahagian
EVALUATION BOARD FOR TPD4S214
Pakej
Box
Lembaran data
1.TPD4S214EVM.pdf ...

HTML Datasheet

TPD4S214 Datasheet.pdf
Pensijilan kami
Dalam stok: 31487
  • Harga seunit: $106.978
  • jumlah kecil: $0.00

Mahukan harga yang lebih baik?
Tambah ke Cart dan Hantar RFQ Sekarang, kami akan menghubungi anda dengan segera.

Kuantiti Harga seunit Ext.Harga
1+ $106.978 $106.98
200+ $42.685 $8,537.00
500+ $41.259 $20,629.50
1000+ $40.554 $40,554.00
Harga di atas tidak termasuk cukai dan kadar pengangkutan, yang akan dikira pada halaman pesanan.
PILIHAN EXPRESS
Kaedah pembayaran
Pensijilan kami

Spesifikasi

Spesifikasi teknologi TPD4S214EVM
Spesifikasi Teknikal Texas Instruments - TPD4S214EVM, Atribut, Parameter dan Bahagian dengan Spesifikasi Sama dengan Texas Instruments - TPD4S214EVM

Atribut produk Nilai atribut  
Pengeluar Texas Instruments  
Digunakan IC / Bahagian TPD4S214  
Jenis Circuit Protection  
kandungan dibekalkan Board(s)  
Siri -  
Atribut menengah -  
Atribut produk Nilai atribut  
sifat utama -  
Pakej Box  
fungsi Electrostatic Discharge (ESD)  
Pautan -  
Nombor produk asas TPD4S214  

Klasifikasi Alam Sekitar & Eksport

ATRIBUT PENERANGAN
Status RoHS Tidak berkaitan
Tahap Sensitiviti Kelembapan (MSL) 1 (Unlimited)
Mencapai status REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Bahagian dengan spesifikasi yang serupa

Tiga bahagian di sebelah kanan mempunyai spesifikasi yang sama dengan Texas Instruments TPD4S214EVM.

Atribut produk TPD4S214EVM TPD4S014EVM TPD50R400C TPD4S009DGSR
Nombor Bahagian TPD4S214EVM TPD4S014EVM TPD50R400C TPD4S009DGSR
Pengeluar Texas Instruments Texas Instruments Texas Instruments
kandungan dibekalkan Board(s) Board(s), Cable(s) - -
Jenis Circuit Protection Power Management - Steering (Rail to Rail)
Pakej Box Bulk - Tape & Reel (TR)
Digunakan IC / Bahagian TPD4S214 TPD4S014 - -
fungsi Electrostatic Discharge (ESD) Circuit Protection - -
Pautan - No - -
Nombor produk asas TPD4S214 TPD4S0 - TPD4S009
sifat utama - Overvoltage Protection - -
Atribut menengah - On-Board LEDs - -
Siri - - - -

TPD4S214EVM datasheet pdf

Muat turun TPD4S214EVM PDF datasheets dan dokumentasi Texas Instruments untuk TPD4S214EVM - Texas Instruments.

HTML Datasheet
TPD4S214 Datasheet.pdf

Maklumbalas Pelanggan

Penilaian: Artikel 10

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Tulis ulasan

Alamat e -mel anda tidak akan diterbitkan.

Penghantaran

Masa penghantaran

Item dalam stok boleh dihantar dalam masa 24 jam.Sesetengah bahagian akan diatur untuk penghantaran dalam masa 1-2 hari dari tarikh semua item tiba di gudang kami.Dan kapal Allelco pesanan sekali sehari kira -kira pukul 17:00, kecuali Ahad.Sebaik sahaja barangan dihantar, anggaran masa penghantaran bergantung kepada kaedah penghantaran dan destinasi penghantaran.Jadual di bawah menunjukkan masa logistik untuk beberapa negara biasa.

Kos penghantaran

  1. Gunakan akaun ekspres anda untuk penghantaran jika anda mempunyai satu.
  2. Gunakan akaun kami untuk penghantaran.Rujuk jadual di bawah untuk caj anggaran.
(Rangka masa / negara / saiz pakej yang berbeza mempunyai harga yang berbeza.)

Kaedah penghantaran

  1. Penghantaran Biasa Global oleh DHL / UPS / FedEx / TNT / EMS / SF Kami menyokong.
  2. Lain -lain lebih banyak cara penghantaran, sila berhubung dengan pengurus pelanggan anda.

Negara biasa rujukan masa logistik
Wilayah Negara Masa logistik (hari)
Amerika Amerika Syarikat 5
Brazil 7
Eropah Jerman 5
United Kingdom 4
Itali 5
Oceania Australia 6
New Zealand 5
Asia India 4
Jepun 4
Timur Tengah Israel 6
Rujukan Penghantaran DHL & FedEx
Caj penghantaran (kg) DHL Rujukan (USD $)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Catatan:
Jadual di atas hanya untuk rujukan.Mungkin terdapat beberapa kecenderungan data untuk faktor -faktor yang tidak terkawal.
Hubungi kami jika anda mempunyai sebarang pertanyaan.

Sokongan pembayaran

Kaedah pembayaran boleh dipilih dari kaedah yang ditunjukkan di bawah: Pemindahan Wire (T/T, Pemindahan Bank), Western Union, Kad Kredit, PayPal.

Pasangan Rantaian Bekalan yang Setia Anda -

Hubungi kami jika anda mempunyai sebarang pertanyaan.

  1. Telefon
    +00852 9146 4856

Pensijilan & Keahlian

Lihat Lagi
TPD4S214EVM Image

TPD4S214EVM

Texas Instruments
98D-TPD4S214EVM

Mahukan harga yang lebih baik? Tambah ke Cart dan Hantar RFQ Sekarang, kami akan menghubungi anda dengan segera.

0 RFQ
Bakul membeli belah (0 Items)
Ia kosong.
Bandingkan senarai (0 Items)
Ia kosong.
Maklum balas

Maklum balas anda penting!Di Allelco, kami menghargai pengalaman pengguna dan berusaha untuk memperbaikinya secara berterusan.
Sila kongsi komen anda dengan kami melalui borang maklum balas kami, dan kami akan bertindak balas dengan segera.
Terima kasih kerana memilih Allelco.

Subjek
E-mel
Komen
Captcha
Seret atau klik untuk memuat naik fail
Muat naik fail
Jenis: .xls, .xlsx, .doc, .docx, .jpg, .png dan .pdf.
Max Saiz Fail: 10MB